could someone look this over please? Ive been having issues with it running super rich, then on decel its pretty lean. a little help fellas...please
could someone look this over please? Ive been having issues with it running super rich, then on decel its pretty lean. a little help fellas...please
Post some info on your car..mods, etc
370 11.1:1 compression
f13 112
ls6 intake and heads
tr6 plugs, ported TB
lid
9" w/ 3.89s
might wanna try logging commanded afr next time too nino lol
I still say your VE table is just too jacked up at this point to make much sense of things.
Just looking at your STFT you can see your nearly 40% overfueled in some areas.
It doesn't have to be perfect, it just needs to be done in two weeks...
A wise man once said "google it"
damn it..i knew something was missing Ill see what I can come up with then. Thanks guys.
yeah chances are your VE is off from those other injectors
Sulski Performance Tuning
2000 WS6 M6 - LS6 (long block, refreshed top end), 10.8:1 CR, 90 mm ported FAST, Exo-Skel, 227/232 cam, QTP HVMC, EWP, GMMG, 9" w/4.11s
2018 Sierra SLT 5.3L A8 - Airaid intake tube, GM Borla catback, L86 Intake/Ported TB
put your transient fuel to stock as well
Sulski Performance Tuning
2000 WS6 M6 - LS6 (long block, refreshed top end), 10.8:1 CR, 90 mm ported FAST, Exo-Skel, 227/232 cam, QTP HVMC, EWP, GMMG, 9" w/4.11s
2018 Sierra SLT 5.3L A8 - Airaid intake tube, GM Borla catback, L86 Intake/Ported TB
ok, have a look at this. i put the stock ls6 timing and ve tables in and did raf again.
I agree, just do some good long logs of your AFR Error % and slowly but surely it should come back in line....Originally Posted by WS6FirebirdTA00
I sorta kinda got him on the right path last night.
It doesn't have to be perfect, it just needs to be done in two weeks...
A wise man once said "google it"
ill get a log done today. im about to do raf since i get to go into work late today I also just ordered my LM1! Thanks again Bill!
not a problem nino...hit me up when you get online later.
It doesn't have to be perfect, it just needs to be done in two weeks...
A wise man once said "google it"